日日人人_亚洲美女在线视频_av手机在线播放_国产大片aaa_欧美中文日韩_午夜理伦三级

 (06·江蘇E篇)

A new eight-kilometre road is under construction that links the port area with the motorway system . It is expected to carry 20,000 trucks and cars a day, which greatly reduces the overcrowded traffic in the center of the city . As part of the project , two four-kilometre road tunnels are being built below the central area of the city , one for traffic to the north and the other for traffic to the south .The two tunnels are about 20 metres below the surface and are 12 metres wide , providing for two lanes of traffic in each direction .

In the upper part of the tunnel two air-conditioning pipes remove the waste gas of trucks and cars and keep the quality of air inside the tunnel . The lighting is at the top of the tunnel , practically at its highest point . There will also be electronic signs at frequent intervals (間隔). They show traffic conditions ahead , and can be seen clearly by drivers . The wall is made up of four main elements , which include a waterproofing covering and , on the inside of the tunnel , a concrete lining (混凝土襯砌).

Each tunnel is roughly round and the lower part of the tunnel is somewhat flat .The surface of the road lies on the base , which is made of concrete and steel  The drainage system (排水系統(tǒng)), just below the road surface on one side , removes any extra liquid , particularly water . In the event of fire , the fire main , which is made of steel , pipes water to many fire hydrant stations at regular intervals along the length of the tunnel . The fire main is at the side of the tunnel , and at the level of the road surface . Other systems in the tunnel will include emergency phones .

72.Each of the tunnels under construction is       .

       A.eight kilometers long and twenty metres wide

       B.eight kilometers long and six metres wide

       C.four kilometers long and twenty metres wide

       D.four kilometers long and six metres wide

73.Which part of the tunnel in the diagram is used to pipe out extra water ?

       A.1.                           B.3.                           C.5.                           D.6.

74.Driving in the tunnel , one can know the traffic conditions ahead through        .

       A.the lights                                                   B.the electronic signs

       C.the trucks and cars                                    D.the emergency phones

75.The passage is mainly about        .

       A.the construction of a road                           B.the design of a road

       C.the construction of two tunnels                   D.the design of two tunnels

答案  72.D  73.C  74.B  75.D

練習(xí)冊系列答案
相關(guān)習(xí)題

同步練習(xí)冊答案
主站蜘蛛池模板: av网址大全在线观看 | 亚洲一区二区三区爽爽爽爽爽 | 不卡av免费在线观看 | 精品久久99 | 麻豆一区一区三区四区 | 国产乱码精品一区二区三区忘忧草 | 久久综合狠狠综合久久 | 日韩aaa| 欧美激情精品久久久久 | av免费网站 | 免费看的毛片 | 久久亚洲精品中文字幕蜜潮电影 | 国产小视频免费在线观看 | 国产精品久久久久久久久 | 一级a性色生活片久久毛片明星 | 亚洲欧美日韩在线 | 欧美日韩国产中文字幕 | 久久精品一区二区三区四区 | 精品久久久久久久人人人人传媒 | 一级篇| 一区在线看 | 综合一区二区三区 | h小视频| 亚洲天堂久 | 国产亚洲精品综合一区91555 | 亚洲精品乱码久久久久久9色 | 国产在线a | 国产一区二区三区在线视频 | 性色视频在线观看 | 曰本人一级毛片免费完整视频 | 欧美精品三区 | 久色电影 | 国产区一区 | 91亚洲一区 | 少妇淫片aaaaa毛片叫床爽 | 国产精品系列在线播放 | 精品国产31久久久久久 | 国产成人欧美一区二区三区一色天 | 日韩精品不卡 | 日韩在线播放欧美字幕 | 天天干天天操天天舔 |